| Construction Photos – Week 18 (May 4 2008) | ||||
![]() |
||||
Photo 1 – Rockfill Beneath Concentrator Creek (28 Apr 08) |
||||
![]() |
||||
Photo 2 – Mesh for Shotcrete - Portal Slope (28 Apr 08) |
||||
![]() |
||||
Photo 3 – Crusher Slope from Portal Slope (30 Apr 08) |
||||
![]() |
||||
Photo 4 – Plant Site view north from Portal Slope (30 Apr 08) |
||||
![]() |
||||
Photo 5 – Lower Access Road at Highway (1 May 08) |
||||
![]() |
||||
Photo 6 – Workshop Pad (1 May 08) |
||||
![]() |
||||
Photo 7 – Lower Access Road - Subgrade (1 May 08) |
||||
![]() |
||||
Photo 8 – Lower Access Road at Process Pad – Topsoil Removal (1 May 08) |
||||
![]() |
||||
Photo 9 – Lower Access Road at Process Pad – Cutting Slope (3 May 08) |
||||
![]() |
||||
Photo 10 – Lower Access Road at Process Pad – Cutting Slope (3 May 08) |
||||
![]() |
||||
Photo 11 – Admin Pad – Filling temporary road (3 May 08) |
||||
![]() |
||||
Photo 12 – Admin Pad – Filling temporary road (3 May 08) |
||||
![]() |
||||
Photo 13 – Workshop and Admin Pad and Lower Access Road (3 May 08) |
||||
![]() |
||||
Photo 14 – Plant Site View North from Upper Access Road (3 May 08) |
||||
![]() |
||||
Photo 15 – Crusher Slope bench (3 May 08) |
||||
![]() |
||||
Photo 16 – Southern Rom Pad at Crusher Slope (3 May 08) |
||||
Construction Photos – Week 17 (April – May 2008) |
||||
![]() |
||||
150 person camp rapidly growing to 400 person camp |
||||
![]() |
||||
Directors visit – Tony Sales Knight Piesold on earthworks progress |
||||
![]() |
||||
Down hole survey of HG Disseminated Resource drilling |
||||
![]() |
||||
Drilling high grade ML portion of Disseminated Nickel zone |
||||
![]() |
||||
Geologist using NITON XRLF hand analyzer on underground Ni core |
||||
![]() |
||||
Lower portal operations in full swing |
||||
![]() |
||||
Southern Geosciences EM Field Crew at Soui Tao Prospect |
||||
![]() |
||||
Surveying on top of processing earthworks pad |
||||
![]() |
||||
Underground stope definition drilling |
||||
Construction Photos – Week 16 (April 14, 08) |
||||
![]() |
||||
| Photo 1 – Crusher Slope (16 Apr 08) | ||||
![]() |
||||
| Photo 2 – Plant Site Access Road (16 Apr 08) | ||||
![]() |
||||
| Photo 3 – Admin Pad – Looking South (17 Apr 08) | ||||
![]() |
||||
| Photo 4 – Excessive Trucks on Workshop Pad (18 Apr 08) | ||||
![]() |
||||
| Photo 5 – Admin Pad – Looking South (17 Apr 08) | ||||
![]() |
||||
| Photo 6 – Excessive Trucks on Workshop Pad (18 Apr 08) | ||||
![]() |
||||
| Photo 7 – Downstream Slope of Admin Pad (19 Apr 08) | ||||
![]() |
||||
| Photo 8 – Crusher Slope – SE Corner (19 Apr 08) | ||||
![]() |
||||
| Photo 9 – Admin Pad – Looking South (17 Apr 08) | ||||
![]() |
||||
| Photo 10 – Excessive Trucks on Workshop Pad (18 Apr 08) | ||||
| Ban Phuc Nickel Project Construction - Week March 25, 2008 | ||||
![]() | ||||
| Plant Site Area - Fill to Upper Plant Site A | ||||
General view of plant site. From Magazine level looking to western valley | ||||
![]() | ||||
| LOWER PORTAL & ROM PAD | ||||
| ||||
| MAGAZINE AREA | ||||
![]() | ||||
Magazine nearing completion. Note Fire Water tank completed Stairway access installed. | ||||
| MAIN ACCESS AREA | ||||
![]() | ||||
Main Access Road to plant site showing nominal grade. Access to workshop and admin areas will be by down ramp. | ||||
| MINE WATER TAKEOFF POINT | ||||
![]() | ||||
| Mine Water take off point in Ban Phuc river 60% complete | ||||
![]() | ||||
| Gabion basket work in progress | ||||
| CAMP SITE | ||||
![]() | ||||
| Camp site Type C #3.ready for hand over. Foundations for #C4 and #C5 commenced 28.03.08 | ||||
![]() | ||||
Rehabilitation test plantings established on camp site fill slopes. | ||||
| Ban Phuc Nickel Project Construction - Week March 11, 2008 | ||||
| UPPER PORTAL AREA | ||||
![]() | ||||
| Upper Portal Long range showing rock bolting nearing completion. Box cut to final trim and Shotcreting substantially complete | ||||
| MAGAZINE AREA | ||||
![]() | ||||
| Magazine Area. Concrete cast roofing in progress. Note stairway to upper level for access to fire water storage area. Water storage 15% completed. In fore ground are mine water supply tanks ready for transport to upper portal. | ||||
| ACCESS ROADS | ||||
| ||||
| Ban Phuc Nickel Project Construction - Week of March 4, 2008 | ||||
| LOWER PORTAL AREA | ||||
![]() | ||||
| Lower Portal Entrance. Note quality of Shotcreting and structural concrete. | ||||
| PLANT SITE AREA | ||||
![]() | ||||
Fill to lower limit of Plant Site and lower valley workshop area | ||||
![]() | ||||
| General view of plant site. Note clean and orderly transitions to fill levels | ||||
| Ban Phuc Nickel Project - Feb 2008 | ||||
| LOWER PORTAL | ||||
![]() | ||||
| Tunnel sets ready for standing and positioning | ||||
| PLANT SITE | ||||
![]() | ||||
| Minimal damage to plant site from recent rains | ||||
| MAIN ACCESS ROAD AFTER RAIN | ||||
![]() | ||||
| Dry out, 1 week after event | ||||
| Ban Phuc Nickel Project Construction - January 2008 | ||||
| ||||
| ||||
![]() | ||||
| Workshop pad. 40 foot containers and dump trucks 070108 | ||||
![]() | ||||
| Final preparation of Plant site floor (Crusher Valley) prior to placing gabions and sub drainage | ||||
![]() | ||||
| Camp Site. 2 x A type units. 4 rooms of 8 handed over 070108 | ||||
![]() | ||||
| Construction office 80% complete. Temp Survey and Geology offices 85% complete | ||||
| Ban Phuc Nickel Project Construction - December 2007 | ||||
![]() | ||||
![]() | ||||
| Main plant area with lower portal off to the right | ||||
![]() | ||||
![]() | ||||
| Installation of Camp Infrastructure | ||||
| ||||