AMR’s
Feasibility Study was completed in November 2005 by Ausenco Engineering,
based in Sydney, Australia (see pdf link below). In August 07 AMR
filed a Technical Report with SEDAR which was compiled by Sandercock
& Associates Pty Ltd. (see pdf link below) which contains the
revised costs analysis for the Ban Phuc Project.
Feasibility Study Results - November 2005 (PDF
Format, 5.2 MB)
Revised Feasibility Study Costs – June 2007 (PDF
Format, 14.5 MB)
Asian Mineral Resources announced today the steps it plans to take to deal with the impact on its Ban Phuc nickel project of the recently announced increase to 20% in the Vietnamese export tariff on nickel concentrates.
Toronto, Ontario - July 10, 2008. Asian Mineral Resources Limited ("AMR" or the “Company”) (ASN-TSX Venture)announced that it has closed the private placement...